Manufacturing, Coventry
4,200 m²High-build epoxy system with full line marking and bay demarcation across a busy 24/7 facility. Installed in phased sections to maintain operations throughout.
Our Work
Every project is different. Every floor is specified to the exact demands of the environment — load, chemical exposure, hygiene requirements, and operational downtime constraints.
500+
Projects completed
17+
Years experience
100k+
Square metres installed
48hr
Survey turnaround
High-build epoxy system with full line marking and bay demarcation across a busy 24/7 facility. Installed in phased sections to maintain operations throughout.
Polyurethane screed with coved skirting throughout a wet processing floor. Specified for thermal shock resistance and full compliance with food hygiene standards.
Broadcast aggregate anti-slip epoxy across heavy machinery zones and pedestrian walkways. HSE-compliant slip resistance ratings achieved throughout.
Cryogenic-grade polyurethane screed installed in a -25°C cold store environment. Specified for extreme thermal cycling and forklift traffic.
Chemical-resistant epoxy system with oil and solvent resistance. Installed across workshop bays with integrated drainage channels and slip-resistant finish.
Complete plinth break-out and reinstatement of damaged floor at refrigerated cold store facility. Redundant concrete was fully removed, the sub-base re-levelled, and a MMA screed installed to deliver a seamless, hygienic finish capable of withstanding extreme thermal cycling and heavy forklift traffic
Full line marking and demarcation package across a major MOT centre. Pedestrian zones, test lanes, test bays, and emergency exit routes all marked to BS EN standards.
Self-levelling epoxy floor with full line marking and hazard demarcation throughout a new MOT centre. Clean white finish with yellow and black safety markings to BS EN standards.
Resin-bound driveway with integrated in-drive LED edge lighting. UV-stable aliphatic resin over a fully permeable SUDS-compliant base, finished with a curved LED border detail for a premium kerb appeal.
Tell us about your floor and we'll provide a no-obligation assessment within 24 hours.