Logistics Warehouse, Coventry
4,200 m²High-build epoxy system with full line marking and bay demarcation across a busy 24/7 logistics facility. Installed in phased sections to maintain operations throughout.
Our Work
Every project is different. Every floor is specified to the exact demands of the environment — load, chemical exposure, hygiene requirements, and operational downtime constraints.
500+
Projects completed
12+
Years experience
1M+
Square metres installed
48hr
Survey turnaround
High-build epoxy system with full line marking and bay demarcation across a busy 24/7 logistics facility. Installed in phased sections to maintain operations throughout.
Polyurethane screed with coved skirting throughout a wet processing floor. Specified for thermal shock resistance and full compliance with food hygiene standards.
Broadcast aggregate anti-slip epoxy across heavy machinery zones and pedestrian walkways. HSE-compliant slip resistance ratings achieved throughout.
Cryogenic-grade polyurethane screed installed in a -25°C cold store environment. Specified for extreme thermal cycling and forklift traffic.
Chemical-resistant epoxy system with oil and solvent resistance. Installed across workshop bays with integrated drainage channels and slip-resistant finish.
Full line marking and demarcation package across a major distribution centre. Pedestrian zones, forklift lanes, loading bays, and emergency exit routes all marked to BS EN standards.
Tell us about your floor and we'll provide a no-obligation assessment within 24 hours.